Client: William S. Hart Union High School District

Project: Castaic High School Electrical Vault Drainage Project

Castaic High School underground electrical vaults were encountering drainage issues. Purpose of this project is to resolve this by connecting the vaults to the existing storm drain system. Scope included but not limited to new storm drainpipe installation, demolish and re-place existing concrete and AC paving, trenching, soil excavation, backfilling and compacting, repair all landscaping, hardscape and other finishes affected/disturbed during the construction.


Delivery Method: Design, Bid, Build

Architect: TDM Architects

Services Provided: Construction Management